The year 2025 has brought new guidelines regarding the installation of multiple electricity meters in residential properties. These new updates focus on fair billing, preventing misuse, and ensuring transparency for all electricity consumers in Pakistan.
What’s New in 2025
The latest policy confirms that homeowners can still apply for more than one electricity meter, but with tighter rules. The main purpose of these changes is to stop people from taking unfair advantage of different tariff categories.
- All electricity consumers will now pay according to the same tariff structure, without any extra benefit for having multiple meters.
- Each application for a second or third meter must include valid proof that the property is divided into separate portions.
- Authorities have started inspections to prevent fake or unnecessary meter installations.

When Multiple Meters Are Allowed
Multiple meters can still be installed under specific circumstances where the house is divided into independent sections.
- If the property has separate entrances or floors functioning like individual units.
- When each portion has independent wiring or separate tenants.
- When approval is granted by the local electricity distribution company after proper verification.
These measures ensure that additional meters are only used where they are genuinely needed, not as a shortcut to reduce bills.
Main Purpose of the New Guidelines
The new 2025 rules have been introduced to maintain fairness and reduce corruption in the power system. Authorities observed that many households were installing separate meters only to reduce their billing category. Now, strong regulations and penalties are being enforced to stop such practices.
The updated policy aims to:
- Ensure fair billing across all consumers.
- Prevent electricity misuse and overloading.
- Increase accountability among users.
- Protect national energy resources.
How to Apply for an Additional Meter
If your home meets the legal and structural requirements, you can still apply for an extra meter through your power distribution company. The process is simple but requires proper documents.
- Visit your local power office (LESCO, MEPCO, or others).
- Submit an application with property ownership and layout proof.
- Wait for inspection and verification by technical staff.
- Upon approval, installation is carried out under the new regulations.
If your house is not divided into independent sections, your application might be rejected under the 2025 guidelines.
Key Points to Remember
- Multiple meters are still legal but strictly regulated.
- False claims or misuse can result in penalties or meter disconnection.
- Always submit authentic documents during the application.
- Inspections will be more frequent under the new policy.
Comparison Table: Old vs New Rules for Multiple Meters
| Feature / Rule | Old Policy (Before 2025) | New Guidelines (2025) |
|---|---|---|
| Application Requirement | Simple and less verification | Strict documentation and proof required |
| Tariff Benefit | Some households enjoyed lower rates | All tariffs now equal for all users |
| Inspection | Rarely conducted | Mandatory inspection before approval |
| Approval Time | Faster with minimal checks | Slower but transparent verification |
| Penalties for Misuse | Limited enforcement | Heavy fines and disconnection |
| Eligibility | Open for all households | Only for divided or multi-unit houses |
Final Thought
The 2025 guidelines are a step toward a fairer and more transparent energy system. Installing multiple electricity meters is still possible, but only for those who truly need them. Homeowners should follow the new rules carefully to avoid penalties and ensure smooth approval. This policy ensures every citizen pays their fair share while keeping the national grid efficient and sustainable.