Apply Online for New Domestic Gas Connection October Update
Are you planning to apply online for new domestic gas connection in October 2025? The Sui Northern Gas Pipeline Limited (SNGPL) has announced that all new residential connections will now be LNG (Liquefied Natural Gas) based. Old natural gas applications are no longer valid. Whether you are applying for the first time or had a pending request, this guide explains the application process, required documents, updated fees, and priority registration system for a smooth connection.
Also Read: BISP 8171 Web Portal Reopens
Also Read: Check Your E-Bike Scheme Application Status
Whatβs New in 2025?
- All previous natural gas applications are cancelled.
- Only online applications are accepted β no manual submissions.
- A separate portal exists for applicants with old demand notices.
- Updated fees depend on property size and urgency.
- Applicants must submit a neighboring household gas bill for verification.
Also Read: NADRA Launches Digital Services For Pensioners
Apply Online for New Domestic Gas Connection Application Process
To ensure transparency, SNGPL now accepts only online applications for LNG connections.
Steps to Apply Online:
- Visit the official SNGPL LNG Online Application Portal.
- Select Domestic LNG Connection type.
- Enter personal details, property information, and CNIC.
- Upload all required documents.
- Submit the application and note the reference number for tracking.
Also Read: Sindh CM Expands Mamata Program
Required Documents for LNG Domestic Connection
| Document | Purpose | Notes |
|---|---|---|
| Valid CNIC | Identity verification | Must be original & active |
| Property ownership proof | Confirms residence eligibility | Utility bill, property deed, or NOC |
| Neighboring gas bill | Infrastructure verification | Recent bill required |
| Photographs (optional) | Meter installation | 1β2 latest photos may be needed |
Priority for Old Applicants (Demand Notice Holders)
- Applicants with an old demand notice will get priority processing.
- No need to resubmit all documents.
- Must use the special portal for old demand notices.
- Applications are processed faster under this category.
Tips:
- Visit the correct portal link on the official website.
- Ensure CNIC and property details match earlier submissions.
- Check application status regularly online.
Category Change: Natural Gas to LNG
- All new connections are LNG only.
- Traditional natural gas requests are obsolete.
- Old pending natural gas applications are invalid.
Why LNG?
- Meets rising urban energy demand.
- Environmentally friendly with reduced emissions.
- Easier monitoring and billing system.
New Fee Structure
- Fees are revised based on property size and urgency of connection.
- Details are available on the official SNGPL portal when applying.
Step-by-Step LNG Meter Registration
Apply Online for New Domestic Gas Connection Once your application is approved, the next step is meter registration:
- SNGPL technician schedules a site visit.
- CNIC and property ownership are verified again.
- LNG meter is installed and pipeline connected.
- Initial gas flow activated.
- Meter reading recorded for billing.
Tips for Consumers:
- Ensure property is accessible for installation.
- Keep past utility bills ready.
- Confirm nearby pipeline connectivity.
Common Issues & Solutions
- Old Applications Cancelled β Solution: Reapply under the LNG portal.
- Missing Documents β Solution: Double-check CNIC, property papers, and neighborβs bill.
- Urgent Connection Delays β Solution: Select urgency category & monitor online.
- Confusion with Demand Notices β Solution: Use correct portal for your case.
Benefits of LNG-Based Domestic Gas Connections
- Eco-friendly: Lower carbon emissions.
- Reliable Supply: Consistent gas flow in cities.
- Online Tracking: Monitor application & meter status.
- Transparent Billing: Standardized monthly bills.
Related Posts










